Orezone Gold (TSX:ORE), a Canadian gold exploration and development company, has announced the latest results of its Phase III resource definition drill program at the Bomboré Gold Mine in Burkina Faso. The program has focused on expanding the P17 zone and converting Inferred Resources into Measured and Indicated, in preparation for the upcoming sulphide expansion study.

Figure 1: Bomboré Plan Map Overview. Source: Orezone Gold

The company’s Phase III program has yielded positive results, with the latest diamond drill results from the P8P9 and Maga zones contributing to over 100,000 meters of additional drilling to be incorporated into the upcoming resource and reserve update and expansion study.

According to Orezone, this marks the final set of Phase III drill results, bringing the company one step closer to achieving its goal of expanding the P17 zone and converting Inferred Resources to Measured and Indicated. The successful completion of this phase is a significant milestone in the company’s ongoing efforts to develop the Bomboré Gold Mine into a world-class mining operation.

Patrick Downey, President and CEO commented in a press release: “Our 2022 resource definition and expansion drill program has exceeded expectations, with several new high-grade zones now well-defined, all of which remain open to further expansion. The most recent results from P8P9 have delineated a new thick, well-mineralized zone, with several high-grade intercepts over downhole widths ranging from 20m to 50m. This zone remains open in several directions including towards surface. All sulphide drill results have now been received and the resource update, which will incorporate over 100,000m of new drilling, is now well-advanced. The sulphide expansion study will provide the platform to significantly increase annual throughput and production at the Bomboré operation and is expected to be released in Q3-2023.”

Figure 2: P8P9 Cross Section 1350N. Source: Orezone Gold
Figure 3: P8P9 Cross Section 1237.5N. Source: Orezone Gold
Figure 4: Maga Cross Section 3650N. Source: Orezone Gold

Highlights from the results are as follows:

  • Delineation drilling at P8P9 revealed a higher-grade zone of plunging mineralization. To date, this zone has been traced over 150m along strike, and remains open at depth and towards surface. The higher-grade zone is similar to that observed in the emerging high-grade P17 zone located 8km to the south as it is associated with, and/or in proximity to, a granodiorite intrusion. Several intercepts at P8P9 returned thick well-mineralized intervals.
  • Phase III drilling at P8P9 was successful in further illustrating the continuity of mineralization below the current shallow reserve pit, with mineralization locally traced to a depth of ~250m below surface.
  • Additional drilling at Maga continued to return several high-grade intercepts in the sulphide zone, further illustrating down-dip continuity. These results follow the more extensive set of Maga drill results released on December 21, 2022.
  • Still outstanding from the Phase III drill program are the RC oxide drill results, which are expected to be released in the coming weeks.

P8P9 Drilling Highlights:

  • 1.72 g/t Au over 40.40m from 99.00m, including 4.31 g/t Au over 8.25m from 126.75m in hole BBD1294
  • 1.49 g/t Au over 53.70m from 39.30m in hole BBD1305, including 13.00m @2.01 g/t from 57.00m
  • 1.05 g/t Au over 30.00m from 182.00m and a further 1.85 g/t Au over 24.00m from 222.00m in hole BBD1298, including 2.88 g/t Au over 11.00m from 225.00m
  • 1.06 g/t Au over 44.00m from 260.00m in hole BBD1312, including 2.75 g/t Au over 8.00m from 271.00m
  • 1.16 g/t Au over 21.00m from 83.00m in hole BBD1288
  • 2.08 g/t Au over 10.30m from 170.50m in hole BBD1289
  • 1.98 g/t Au over 11.70m from 31.80m in hole BBD1309, including 4.59 g/t Au over 4.50m from 39.00m
  • 1.37 g/t Au over 14.40m from 166.00m in hole BBD1293

Maga Drilling Highlights:

  • 5.59 g/t Au over 15.00m from 221.00m in hole BBD1287, including 62.21 g/t Au over 4.50m from 225.00m
  • 3.14 g/t Au over 18.00m from 197.00m in hole BBD1285
  • 9.78 g/t Au over 2.00m from 208.00m in hole BBD1283
  • 10.83 g/t Au over 2.00m from 303.00m in hole BBD1283

Table 1: P8P9 Highlight Drill Results

Hole # From (m) To (m) Length (m)* Grade (g/t gold)
BBD1264 102.50 107.00 4.50 3.47
and 147.35 148.20 0.85 66.36
BBD1265 122.80 125.50 2.70 4.21
BBD1267 86.70 106.00 19.30 0.60
and 115.00 131.00 16.00 0.88
BBD1268 65.00 77.00 12.00 1.33
incl. 71.00 72.00 1.00 9.64
and 209.00 212.00 3.00 5.21
BBD1279 113.00 127.00 14.00 1.37
incl. 121.00 123.15 2.15 4.46
BBD1288 83.00 104.00 21.00 1.16
and 109.60 141.00 31.40 0.80
incl. 138.00 140.00 2.00 3.10
and 223.40 233.00 9.60 1.28
BBD1289 170.50 180.80 10.30 2.08
and 191.00 193.00 2.00 6.17
BBD1290 7.80 26.00 18.20 0.86
and 109.20 126.75 17.55 1.59
incl. 125.00 126.75 1.75 8.46
BBD1293 63.10 84.00 20.90 0.90
incl. 72.00 73.00 1.00 6.18
and 166.00 180.40 14.40 1.37
BBD1294 17.40 51.00 33.60 0.98
incl. 20.20 40.00 19.80 1.31
and 99.00 139.40 40.40 1.72
incl. 126.75 136.00 8.25 4.31
and 144.60 145.60 1.00 12.81
and 157.00 159.00 2.00 14.23
BBD1295 257.00 274.00 17.00 0.64
BBD1298 182.00 212.00 30.00 1.05
incl. 188.00 189.00 1.00 9.38
and 222.00 246.00 24.00 1.85
incl. 225.00 236.00 11.00 2.88
and 257.00 280.00 23.00 0.59
BBD1300 0.50 8.80 8.30 1.77
incl. 4.10 5.40 1.30 6.66
BBD1301 85.00 101.00 16.00 0.79
BBD1304 114.00 121.00 7.00 1.54
BBD1305 39.30 93.00 53.70 1.49
incl. 57.00 70.00 13.00 2.01
BBD1306 16.00 26.00 10.00 1.08
and 102.00 114.00 12.00 1.02
incl. 106.00 108.00 2.00 3.49
BBD1309 31.80 43.50 11.70 1.98
incl. 39.00 43.50 4.50 4.59
BBD1312 260.00 304.00 44.00 1.06
incl. 271.00 279.00 8.00 2.75
and 345.65 349.85 4.20 3.01
         

* True widths for P8P9 area drilling are approximately 70 to 85% of drilled lengths.

Table 2: Maga Highlight Drill Results

Hole # From (m) To (m) Length (m)* Grade (g/t gold)
BBD1272 27.00 31.50 4.50 4.10
BBD1283 208.00 210.00 2.00 9.78
and 303.00 305.00 2.00 10.83
BBD1285 197.00 215.00 18.00 3.14
BBD1286 192.00 209.00 17.00 0.72
incl. 202.00 204.00 2.00 1.85
BBD1287 212.00 216.00 4.00 3.01
and 221.00 236.00 15.00 5.59
incl. 225.00 226.00 1.00 62.21

* True widths for Maga area drilling are approximately 85% of drilled lengths.

 

The above references an opinion and is for information purposes only. It is not intended to be investment advice. Seek a licensed professional for investment advice. The author is not an insider or shareholder of any of the companies mentioned above.

Orezone Gold (TSX:ORE) has announced ongoing drill results from its Phase 3 program at the Bomboré Gold Project in Burkina Faso. Results from P17S-NE along the P17 mineralized trend have been reported from the program. The Phase 3 drilling at P17S was focused to define the continuity of the repeat, folded, high-grade granodiorite mineralized zones. The positive results announced by the company confirmed those zones.

Dr. Pascal Marquis, SVP of Exploration, commented in a press release: “I am extremely pleased with the ongoing drilling results at P17S, which confirm that this deposit continues to grow, not only along the known zones, but with new zones intersected outside of the current resource pit shell. Final results from this program at P17S are expected in the coming weeks. Drilling is now underway at the Siga deposits, as part of our resource conversion program, but we expect to be back drilling at P17S later this year to follow up on these very encouraging results.”

Highlights from the drill results are as follows:

  • Down-plunge continuity of the mineralized zones at P17S has now been extended over an additional 100 m beyond the last set of drill results, with more results pending over the next 100 m.
  • Drilling has also intercepted significant new mineralization in the footwall of the resource area with Hole BBD1132 returning 30 m of 1.73 g/t Au, which is still open both up and down plunge.
  • The mineralized zones are open towards the surface and at depth over a strike of at least 300 m.

P17S Drilling Highlights:

  • 20.30 m of 1.88 g/t Au from 171.00 m in hole BBD1104
  • 10.65 m of 3.69 g/t Au from 190.00 m in hole BBD1108
  • 45.30 m of 1.29 g/t Au from 189.00 m in hole BBD1110
  • 18.00 m of 1.59 g/t Au from 134.00 m and 22.15 m of
    1.34 g/t Au from 179.85 m in hole BBD1118
  • 12.00 m of 2.45 g/t Au from 76.00 m in hole BBD1119
  • 18.00 m of 1.74 g/t Au from 124.00 m in hole BBD1120
  • 19.50 m of 3.20 g/t Au from 230.50 m in hole BBD1131
  • 8.00 m of 6.32 g/t Au from 127.00 m and 30.00 m of
    1.73 g/t Au from 245.00 m in hole BBD1132

Table 1: P17 Trend Highlight Drill Results

Hole
#
From
(m)
To
(m)
Length
(m)*
Grade
(g/t gold)
BBD1104 134.00 143.00 9.00 2.69
and 171.00 191.30 20.30 1.88
incl. 171.00 178.00 7.00 2.13
BBD1105 141.00 146.00 5.00 2.58
and 166.00 178.00 12.00 1.98
and 200.00 209.00 9.00 2.27
and 222.00 226.90 4.90 2.16
and 245.40 251.40 6.00 2.85
BBD1106 167.00 184.00 17.00 1.14
and 190.00 205.15 15.15 1.75
incl. 192.00 193.00 1.00 10.84
BBD1107 67.00 84.00 17.00 1.47
BBD1108 106.70 109.00 2.30 4.66
incl. 106.70 107.80 1.10 9.04
and 118.00 135.00 17.00 1.44
and 190.00 200.65 10.65 3.69
incl. 193.00 198.20 5.20 6.40
BBD1109** 198.00 203.00 5.00 3.63**
incl. 201.00 203.00 2.00 6.88**
and 208.00 215.00 7.00 2.67**
BBD1110** 189.00 234.30 45.30 1.29**
Incl. 193.00 207.00 14.00   2.05**
Incl. 232.00 234.30 2.30   7.83**
BBD1116 17.00 24.50 7.50 1.61
and 48.00 53.00 5.00 2.79
and 58.00 65.80 7.80 3.27
BBD1118 101.00 111.00 10.00 2.28
and 134.00 152.00 18.00 1.59
and 179.85 202.00 22.15 1.34
BBD1119 29.00 32.00 3.00 3.44
and 76.00 88.00 12.00 2.45
incl. 82.00 83.00 1.00 9.66
BBD1120 124.00 142.00 18.00 1.74
incl. 126.00 127.00 1.00 11.45
BBD1122 195.00 211.00 16.00 1.43**
and 224.00 242.00 18.00 0.89**
and 280.35 287.20 6.85 2.86**
BBD1123 199.00 201.00 2.00 5.63**
Incl. 199.00 200.00 1.00 9.27**
BBD1131 230.50 250.00 19.50 3.20**
incl. 233.20 239.90 6.70 6.40**
BBD1132 127.00 135.00 8.00 6.32**
incl. 127.00 133.00 6.00 7.89**
and 245.00 275.00 30.00 1.73**
*        True widths for P17S drilling are approximately 90% of drilled lengths.
**     Preliminary results without leach residue assays. Final grades will typically increase by 4-6% from those stated.

Figure 1: P17 Trend Plan Map

Source: Orezone Gold

Figure 2: P17 Trend Long Section

Source: Orezone Gold

Figure 3: P17S Section 730280E – Pre 2022 Drill Programs

Source: Orezone Gold

Figure 4: P17S Section 730280E – Drilling to Date

Source: Orezone Gold

 

The above references an opinion and is for information purposes only. It is not intended to be investment advice. Seek a licensed professional for investment advice. The author is not an insider or shareholder of any of the companies mentioned above.

If you would like to receive our free newsletter via email, simply enter your email address below & click subscribe.

MOST ACTIVE MINING STOCKS

 Daily Gainers

 THEMAC Resources Group Limited MAC.V +60.00%
 Ironbark Zinc Ltd. IBG.AX +50.00%
 Azincourt Energy Corp. AAZ.V +33.33%
 Casa Minerals Inc. CASA.V +30.00%
 Austral Gold Limited AGD.AX +27.27%
 GTI Resources Ltd. GTR.AX +25.00%
 Black Iron, Inc. BKI.TO +22.22%
 Eclipse Metals Limited EPM.AX +20.00%
 Augur Resources Limited AUK.AX +20.00%
 Arizona Metals Corp. AMC.TO +20.00%